When trains are present, drivers seeking to cross the railroad tracks at Atlanta Highway and Lights Ferry Road in Flowery Branch should expect longer waits due to culvert reconstruction. Norfolk Southern has implemented an order that requires trains to decrease their speeds to approximately 10 miles per hour along the stretch undergoing reconstruction. This has led to additional vehicle congestion at railroad crossings.
Culvert repair under railroad slowing traffic in Flowery Branch