View Mobile Site


TOP RECENT CONTENT

NATIONAL NEWS VIDEO

Georgia DOT to hold meeting about Lula bridge project

POSTED: November 21, 2008 5:00 a.m.

A public meeting on a proposed bridge replacement and road alignment on Ga. 52 in Lula is set for Dec. 2 at Lula Elementary School.

Georgia Department of Transportation engineers will be available 5-7 p.m. in the school cafeteria to discuss the project. The school is at 6130 Chattahoochee St.

There will be no formal presentation.

"Along with replacing the bridge, we plan to straighten out some curves and flatten the road around the bridge," which crosses the Chattahoochee River, said DOT district engineer Russell McMurry.

The project will focus on about one mile of Ga. 52 at the bridge.

Anyone unable to attend the meeting may send comments to Glenn Bowman, Georgia DOT, 3993 Aviation Circle, Atlanta, GA, 30336. All comments will be considered in the development of the final project design and must be received by Dec. 16.

The plans can be viewed after the meeting at www.dot.ga.gov. Click on "Public Outreach," then select the project’s county and click "Go."



Comments

Commenting not available.
Commenting is not available.

LOCAL

SPORTS

LIFE & GET OUT

LOCAL VIDEO


Contents of this site are © Copyright 2014 The Times, Gainesville, GA. All rights reserved. Privacy policy and Terms of service

Powered by
Morris Technology
Please wait ...